42" 1440psi Sour Horizontal Horizontal Inlet Separator Separator 3 Phase
bookmark_border Watch2006 Larsen & D'Amico 42 in x 12 ft horizontal 3-phase separator package, MAWP 1,440 psig at 130 °F, CRN L8586.213, housed with fuel gas scrubber and 4 in meter run.
2006 horizontal 3-phase separator package with a vessel built by Larsen & D'Amico Mfg. Ltd. and packaged by Argo Sales Ltd., rated 1,440 psig at 130 °F. The 42 in x 12 ft vessel sits in a metal-clad building with its fuel gas scrubber, 4 in meter run, relief valve and controls, set up as a complete high-pressure inlet separation and measurement package. It is ASME U-stamped and registered in Alberta (CRN L8586.213).
Key Specs
- Type: horizontal 3-phase inlet separator, housed package
- Size: 42 in x 12 ft
- Year built: 2006
- MAWP: 1,440 psig at 130 °F (9,928 kPag at 54 °C)
- MDMT: -22 °C (-8 °F) at 9,928 kPag
- Shell thickness: 1.750 in
- Head thickness: 1.6875 in
- Corrosion allowance: 0.125 in
- Service: listed as sour
Nameplate / Registration
- Fabricator: Larsen & D'Amico Mfg. Ltd., Edmonton, AB
- Code stamp: ASME U, W, HT, RT 1
- CRN: L8586.213 (ABSA directory: base design L8586.2, Larsen & D'Amico, vessel, drawing LD-3911-A1/A2)
- A number: 549044
- Serial: HS-13256
- Fuel gas scrubber: Larsen & D'Amico, MAWP 150 psi at 200 °F, MDMT -20 °F at 150 psi, corrosion allowance 0.0625 in, CRN L9476.213
Condition
- Rated B (used, good condition)
- Connection status: disconnected
What's Included
- Separator vessel with relief valve, level controls and control valves
- Fuel gas scrubber
- Meter run by Miquelon Meter Services: 4 in Sch 80, AGA 3C, max orifice 2.625 in, S/N MM2709 (02/2006)
- Chart recorder
- Metal-clad building with door, window and skid
Photos & Documents
- 9 photos: building exterior, vessel and piping inside the building, separator and scrubber nameplates, meter run tag
- No documents posted
Verification Recommendations
- Confirm sour-service design (NACE MR0175 / ISO 15156 materials); hazard labels on the vessel read natural gas (sweet) and produced water (sweet)
- Confirm 3-phase internals; the nameplate reads horizontal inlet separator
- Request the U-1A data report and the latest inspection record
- Confirm building dimensions and shipping weight
- Confirm registration for the destination province if outside Alberta