Diesel Hydrotreater Reactor 12'-6" ID x 75'-6" T/T, 2,125 psig

bookmark_border Watch

DS207-B-C201A-1.xls

PD207-A-2003-4.pdf


file_download Download All in ZIP

Description

Unused diesel hydrotreating reactor, 12'-6" ID x 75'-6" T/T, built by Kobelco to ASME VIII Div 2. Design 2,125 psig @ 840 °F / full vacuum @ 350 °F, MDMT -20 °F. Cr-Mo-V heavy-wall shell with 347 SS weld overlay, hemispherical heads, Class 1500 RF nozzles, full RT, PWHT. Never placed in service.

Item Info
Misc Type:
Vessels
Misc Item Title:
Diesel Hydrotreater Reactor 12'-6" ID x 75'-6" T/T, 2,125 psig
Manufacturer:
Kobelco (Kobe Steel, Ltd.)
Dimensions:
12'-6" ID x 75'-6" T/T (shipping envelope 32.1 x 4
Pressure:
2,125 PSI
General Info
Condition Rating:
B — Used, Good Condition
Condition Details:
New/unused surplus. Never installed or placed in service (project cancelled before installation). Stored horizontally on transport saddles with nozzles blinded. External weathering/surface rust from outdoor storage; 347 SS overlay visible clean in head interior photos.
Skidded:
No
Housed:
No
Connection Status:
Disconnected
Warranty:
No
Overall Length:
32.1 m
Notes:

Unused Diesel Hydrotreater Reactor: 12'-6" ID x 75'-6" T/T, 2,125 psig @ 840 °F, ASME Section VIII Division 2

This is a heavy-wall, hot-wall, fixed-bed hydroprocessing reactor, built by Kobelco (Kobe Steel, Ltd.) for a diesel hydrotreating train. It was fabricated, post-weld heat treated, fully radiographed and shipped, but it was never installed or operated. It is one of a matched pair: IH-15529 is its sister unit, and two more reactors of the same diameter and rating are also available. That makes it suitable for a single large reactor, a lead/lag pair, or a complete two-train build.

The shell and hemispherical heads are Cr-Mo-V low-alloy steel (2¼Cr-1Mo-¼V / 3Cr-1Mo-¼V class), fully lined with a Type 347 stainless steel weld overlay (1/8" minimum). This is the standard metallurgy for high-temperature, high-hydrogen-partial-pressure service with H2S. The vessel is designed for a multi-bed catalyst arrangement with four interbed quench zones. Tray support rings and beam lugs are in place, along with skin-thermocouple provisions (multi-point TI nozzles), eight interbed catalyst-withdrawal nozzles, four 8" quench nozzles and a 32" ID top manway. Every external connection is ASME Class 1500 RF. An integral support skirt sets the reactor vertically on a foundation.

Specifications

ItemValue
Design codeASME Section VIII, Division 2
Design pressure (internal)2,125 psig @ 840 °F
Design pressure (external)Full vacuum @ 350 °F (15 psi external)
MDMT-20 °F
Max. operating temperature (design basis)789 °F
Inside diameter (inside lining)12'-6"
Tangent-to-tangent length75'-6"
HeadsHemispherical, both ends
Shell/head materialHeavy-wall Cr-Mo-V low-alloy steel (2¼Cr-1Mo-¼V / 3Cr-1Mo-¼V family: SA-336 F22V/F3V, SA-542 Type C/D, SA-832 22V, SA-541/SA-508 Gr 3V/22V per design specification)
Internal liningType 347 stainless steel weld overlay, 1/8" minimum (overlay serves as corrosion allowance)
Nozzles & flangesCr-Mo-V forgings (SA-182 F22V/F3V, SA-336, SA-541/508 Gr 3V/22V)
External connectionsASME Class 1500 RF
RadiographyFull (100%), joint efficiency 100%
PWHTYes
SupportIntegral support skirt (vertical service)
Fabricator-supplied accessoriesLadder & platform clips, insulation clips & rings, support skirt
Internal design loadSupports up to 925,000 lb of internals, catalyst and inert ceramic balls
Bed arrangementMulti-bed catalyst design with 4 interbed quench zones; tray support rings and beam lugs in place
ManufacturerKobelco (Kobe Steel, Ltd.)
Shipping dimensions / weight3210 x 434 x 509 cm (L x W x H) shipping envelope; gross 525,570 kg / net 504,850 kg (stencilled shipping label)
StatusNew/unused. Never placed in service. Stored horizontally on transport saddles with nozzles blinded

Nozzle schedule

MarkQtySizeService
A112"Inlet (top head)
B118"Outlet (bottom head)
C132" IDManway (top head)
D18"Catalyst withdrawal
E812"Catalyst withdrawal (interbed)
F63"Temperature indication (TI)
G48"Quench (6½" min. ID)
H53"Temperature indication (TI)
J12"Neutralization

All external connections ASME Class 1500 RF.

Buyer guidance

Inspection. Each reactor was built, PWHT'd and fully radiographed, then shipped with all nozzles blinded. It has never been installed or placed in service. Before re-commissioning, plan a re-certification inspection by an Authorized Inspector: external visual of the low-alloy shell after long-term outdoor storage, UT thickness survey, internal visual and PT/UT of the 347 SS weld overlay (focus on the bottom head and nozzle bores), flange-face inspection on all Class 1500 nozzles, hardness checks on Cr-Mo-V welds, and a hydrostatic test per the original data report. Temper-embrittlement and hydrogen-service requirements for heavy-wall Cr-Mo-V reactors are covered by API RP 934-A and API RP 941; build your fitness-for-service plan around them.

Jurisdiction & registration. The reactor is built to ASME Section VIII Division 2 for registration in Alberta; the nameplate and manufacturer's data report carry the stamp and CRN details. A buyer installing outside Alberta must register the design in the destination province (provincial CRN re-registration through TSSA, BC Technical Safety, etc.) using the manufacturer's data report and design calculations. For ABSA (Alberta) installations, update the existing registration to the new owner and site. For U.S. or international installations, ASME Code construction supports acceptance; Division 2 vessels also require the user's design specification and the manufacturer's design report to be reconciled for the new service by a registered engineer.

Transport. Each reactor ships as a single super-load: about 32.1 m long x 4.34 m wide x 5.1-5.2 m high on its transport saddles, at about 505-516 tonnes net. Moving it requires engineered multi-axle hydraulic trailers or SPMTs, route engineering and bridge analysis, and superload permits. The vessels sit in the Fort McMurray, AB area, which connects to Alberta's designated high-load corridor. Barge or module-carrier routes apply for coastal or export destinations. Lifting lugs are fitted. Plan the tail and lift with a heavy-lift contractor.

Applications. Diesel/distillate hydrotreating (ULSD), gas-oil/VGO hydrotreating, FCC feed pretreatment, mild hydrocracking, renewable diesel / HVO hydrodeoxygenation (the 347 SS overlay and 840 °F rating suit HEFA/co-processing service), and other high-pressure hydrogen fixed-bed duties: hydrodesulfurization (HDS), hydrodenitrogenation (HDN) and aromatics saturation.

Financial Info
Availability Status
Available
Location
Nearest Town / City
Fort McMurray
Province
AB
Country
Canada
Share item via